阿雷多矿(Aredor mine)采用常规的索斗铲方法开采金刚石冲积矿床。1984年投产,当时的方针是:雨季在阶地上开采,旱季在河滩上开采。早期的生产结果令人失望,未能达到地质评价的预计品位。1985年,矿山已安装的生产能力翻了一番,加之作了其他一些变更。所以矿山实际生产能力差不多达到了原来的三倍。为了重新评价现有储量并增加保有储量,实施了一项大规模的地质计划,包括使用比较先进的评价方法。结果,河滩区域内的储量大幅度地增加,占了总储量的最大部分。因此,不可避免地要改变生产方针,必须研究进出河滩(在雨季河滩往往受淹)的方法,以便全年都能在这些地区进行开采。有许多采区位于巴乌莱(Baoule)河两岸的河滩及河床上,河水的洪峰流量为400m~3/s。河流改道以后,可以全天候地进出这些采区,更重要的是可以避免采区受淹。阿雷多矿已完成六项河流改道的大工程,总长约12km。这些工程全部达到了预期目的,从而可以按照各采区的经济评价结果,来制订生产计划,而无须再过多地考虑地层的自然条件或季节因素。根据曼宁公式(Manning equation)计算了渠道尺寸,取得了十分满意的结果。文中介绍了河流改道准备和防洪的各项实际工作。还介绍了另一个实例及实施该工程的详细费用计算。
The Aredor mine exploits the conventional dragline method to extract diamond alluvial deposits. Put into operation in 1984, when the guidelines are: the rainy season mining in the terraces, the dry season in the riverbank mining. Early results of the production were disappointing and failed to reach the expected grade for geological evaluation. In 1985, the installed capacity of mines doubled, along with other changes. Therefore, the actual production capacity of the mine almost reached the original three times. In order to re-evaluate the existing reserves and increase their holdings, a large-scale geological plan was implemented, including the use of more advanced evaluation methods. As a result, reserves in floodplains have increased substantially, accounting for the largest portion of total reserves. Therefore, it is inevitable to change the course of production. It is necessary to study ways to get in and out of the floodplain, which is often flooded in the rainy seasons, so that mining can take place in those areas throughout the year. There are many mining areas located on banks and riverbed banks of the Baoule River with a peak flow of 400m3 / s. After the diversion of the river, it is possible to access these mining areas around the clock and, more importantly, to avoid flooding the mining area. The Areido Mine has completed six major river diversion projects, a total length of about 12km. All of these projects have achieved their intended purpose so that production plans can be formulated according to the economic evaluation results of each mining area without undue consideration of the natural conditions or seasonal factors of the strata. According to the Manning equation, the channel size was calculated and the result was very satisfactory. The article describes all the practical work of river diversion preparation and flood control. Another example is given as well as detailed cost calculations for implementing the project.