论文部分内容阅读
应用钻孔千斤顶法对万家寨引黄工程总干一、二级地下泵站的不同岩层的弹性模量进行了现场测试 ,测试数据经过数理统计方法进行处理 ,并给出了不同岩层平行于层面与垂直于层面的岩体弹性模量数的建议值。
The drilling jack method was used to test the elastic modulus of different rock formations in the first and second underground pumping station of Wanjiazhai Yellow River Diversion Project. The test data were processed by the method of mathematical statistics. The different rock strata parallel to Recommended values for the elastic modulus of the rock mass in the plane and in the plane.