论文部分内容阅读
近年来江苏省输变电工程项目发展迅速,工程建设加剧了沿线区域的水土流失。对江苏省输变电工程建设的水土流失影响进行了识别和分析,结合岷珠500 kV输变电工程实例,采用类比法和模型预测法进行了水土流失量的预测,并针对不同的防治分区,有效配置了水土保持措施。
In recent years, the transmission and transformation project in Jiangsu Province has developed rapidly, and the project construction aggravated the soil and water loss in the areas along the line. This paper identifies and analyzes the impact of soil and water loss on the transmission and transformation project in Jiangsu Province. Based on the 500 kV transmission and transformation project in Minzhu, the amount of soil and water loss is predicted by analogy and model prediction. , Effective allocation of soil and water conservation measures.