我厂现有300米~3高炉三座,24米~2烧结机两台,具备年产生铁51万吨和烧结矿52万吨的设备能力。现就近期技术改造情况及效果简介如下。
I plant the existing 300 meters to 3 blast furnace three, 24 m ~ 2 sintering machine two, with an annual output of 510,000 tons of iron and 5200 tons of sinter equipment capacity. Now on the recent technological transformation and the effect is as follows.