我省的一个34名干部99名工人的小型桥梁工程队,在1963年里克服了工程任务量大分散,施工力量薄弱以及开工晚、工期短等等困难,完成了井筒基础15米跨径、排架桩圢台10米,7.5米、6米等不同跨径钢筋混凝土桥梁7座及16米跨径拱桥一座,共完成了永久性桥梁8座延长276.72米,涵管3,000节,工作量共90万元,他们的做法主要有以下几个方面:一、设立预制场,推行装配式、组织流水作业,减少常年施工点。为解决施工力量弱,工程分散的矛盾,该队采取了尽量减少施工点的办法,除了在下井筒的八虎力桥和明水砖拱桥工程设立了固定工地外,其他6座桥梁都采用集中预制巡回按装的方法,由于在预制场集中预制构件,钢筋混凝土工程施工的机械
A small bridge engineering team of 99 workers in 34 cadres in our province overcame the difficulties of large-scale construction tasks, weak construction strength, late start-up and short construction period in 1963, completed the 15-meter span of wellbore foundation, A total of 7 bridges and 10 bridges spanning 10 meters, 7.5 meters and 6 meters with different span diameters, a total of 276.72 meters of 8 bridges were extended, 3,000 were culverts, and the workload was 90 Ten thousand yuan, their approach mainly in the following areas: First, the establishment of prefabricated field, the implementation of assembly type, organization of assembly line operations, reduce perennial construction point. In order to solve the contradiction between weak construction force and scattered engineering, the team adopted the method of minimizing the construction site. Except for the fixed construction site under the Bailuli Bridge and Mingshui Brick Arch Bridge project of the lower wellbore, the other six bridges adopted the centralized prefabrication Circuit by the installation method, due to the prefabricated site focused on prefabricated components, reinforced concrete construction machinery