保证工程安全,充分发挥水库效益,这是作好水库控制运用工作的前提。几年来,红山水库的控制运用工作根据设计要求和上级提出的任务,结合自然情况和上下游要求,在控制运用方面作了一些工作,发挥了一定效益。在防洪方面:水库合垄后,一九六二年七月,上游发生了历史上罕见洪水,入库洪峰12700秒立米,六天洪量12.7亿立米,出库流量仅995秒立米。以后各年又先后发生五次超过2000
To ensure project safety, give full play to reservoir efficiency, which is a prerequisite for reservoir control and utilization. In recent years, the work of control and utilization of Hongshan Reservoir has made some efforts in the control application according to the design requirements and the tasks proposed by its superiors in combination with the natural conditions and the requirements of the upstream and downstream areas, and has exerted some benefits. In flood control: After the reservoir was amalgamated, in July 1962, a rare historical flood occurred in the upper reaches of the reservoir. The flood peak of 12,700 seconds was stored, the flood volume was 1,270 million cubic meters in six days and the discharge flow was only 995 seconds. In subsequent years, it happened five times more than 2000