论文部分内容阅读
主要介绍了上犹江水电厂一号水轮发电机组增容改造的原因及增容改造前后试验和运行情况。
This paper mainly introduces the reasons for the capacity increase and transformation of No.1 Hydroelectric Generator Unit of Shangyoujiang Hydropower Station and the test and operation before and after the capacity expansion and transformation.