2009年7月至9月期间,对厦门大桥进行了全面结构检测。通过本次检测确认了桥梁的结构安全状况,为下一步有针对性的结构加固设计提供了依据。
July 2009 to September period, Xiamen Bridge conducted a comprehensive structural testing. Through this test, the structural safety of the bridge is confirmed, which provides the basis for the targeted structural reinforcement design in the next step.