盖挖逆作法在城市交通繁忙地段,无敞开工作面的地铁车站中有极大的应用前景。结合北京地铁某车站工程实例,利用变位分配及控制体系在施工中全过程进行动态控制;同时对中桩进行静载及内力试验,以保证其自身具备足够的承载能力和抗变形能力,并对中间桩(柱)的施工垂直定位技术进行了创新;在车站开挖过程中,按照中间桩(柱)和结构差异沉降控制标准进行分阶段、全过程控制;最后通过信息化施工监测实现车站的结构及周边地层的环境控制,满足设计要求,保证施工过程中结构的安全性以及周边建筑物的安全。
Cover dug reverse method in the urban traffic is busy, no open face subway station has great application prospects. Combined with a station project of Beijing Subway, dynamic control is carried out in the whole process of construction by means of displacement distribution and control system. At the same time, static loading and internal force tests of the pile are carried out to ensure its own carrying capacity and deformation resistance capability. In the station excavation process, according to the middle pile (column) and structural differential settlement control standards for stage, the whole process of control; Finally, through the information construction monitoring of the station The structure and surrounding strata of environmental control, to meet the design requirements to ensure that the construction process of the safety of the structure and the surrounding buildings.