古田溪为闽江左岸支流之一,水力蕴藏极为丰富,最大出力256,000瓩,多年平均电能约12亿度,原拟分三级开发,现为减少开挖工程量,以利提前完成,决定改为四级开发,提前2年在1959年年底,1~4级水电站均将先后建成发电(一级62,000瓩,二极130,O00瓩,三级和四级各为32,000瓩。一级水电站利用落差约130公尺,装机容量为62,000瓩。除第一期工程已于1956年3月装成两台各为6,000瓩的机组发电外,现正在赶建二期工程中,原计划在1960年完成发电的,在党的建设社会主义总路线的光辉照
Gutian River is one of the tributaries on the left bank of the Minjiang River. Its hydraulic power is extremely rich. Its maximum output is 256,000 tons. Its average annual energy consumption is about 1.2 billion kilowatt-hours. Originally planned to be developed in three stages, Gutian River now reduces the amount of excavation work and facilitates early completion. For the four-level development, two years in advance By the end of 1959, 1 to 4 hydropower stations will have completed power generation (62,000 一 in first class, 130,000 二 in 二, 32,000 三 in classes III and IV). A drop of about 130 meters and an installed capacity of 62,000 除. Except for the first phase of the project, which was completed in March 1956 with two units of 6,000 各 each generating power, the second phase of the project is under construction and was originally planned to be completed in 1960 After the completion of power generation, the brilliant line of socialism in the Party’s building is shining