澜沧明珠——小湾水电站掠影

来源 :云南水力发电 | 被引量 : 0次 | 上传用户:lovejr622
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
华能澜沧江小湾水电站位于云南省南涧县与风庆县交界处的澜沧江中游河段,系澜沧江中下游河流规划的8个梯级电站的第2级,属大(Ⅰ)型一等工程,挡水建筑物为混凝土双曲拱坝,最大坝高294.5m,坝顶弧长892.8m,水库库容149×10~8m~3,电站装机容量4200MW,(6×700MW),是以发电为主,兼顾防洪,灌溉等综合效益的特大型水电工程。 Huaneng Lancang River Xiaowan Hydropower Station is located in the midstream of the Lancang River at the junction of Nanjian County and Fengqing County in Yunnan Province. It is the second level of 8 cascade hydropower stations planned for the middle and lower reaches of the Lancang River. It is a large (Ⅰ) The water dam is a concrete double-curvature arch dam with a maximum dam height of 294.5m, an arc length of 892.8m at the crest of a dam and a reservoir capacity of 149 × 10 ~ 8m ~ 3. The installed capacity of the power station is 4200MW (6 × 700MW) Take into account flood control, irrigation and other comprehensive benefits of large-scale hydropower projects.
其他文献
在对住房限购政策的各种批评中,最为尖锐的批评之一是:限购政策要么带来了政府债务急剧增长,要么导致了一个城市基本建设投资的缓慢发展。利用相关数据,发现限购政策的实施和
全球化是一个矛盾的统一体,其发展是波浪式前进的过程,在全球化进程中始终包含着分离的趋势,质疑全球化主流趋势的声音集结在一起,形成反全球化浪潮。全球化又是一把"双刃剑"
介绍了多重平衡标准平衡常数的技巧性计算公式及适用范围,利用该公式解题简捷、快速、准确,还可以直观判断反应的方向性及反应程度。
<正>美国ITT工业公司近日宣布赢得价值约1600万美元的合同,为海军特种部队提供可以在水下工作的AN/PVS-14单目夜视镜和相关配件。预计,相关的工作将于2009年9月结束。这种夜
以政策和文献梳理总结为认识基点,以实地调研和现状分析为资料支撑,深入调查湖北省集体建设用地使用权情况,归纳湖北省典型流转模式;同时在调研基础上,结合对比其他地方政策,
1病例简介女,54岁,因间断性发热、咳嗽,伴消瘦乏力半年入院。外院查血象:白细胞14.4&#215;109/L。予以抗感染治疗,咳嗽有所好转。停药1周后再次发热,咳嗽伴少量白色黏痰。体格检查:轻
目的通过对主动脉弓离断(IAA)胎儿的超声声像特征进行分析,探讨胎儿IAA的诊断思路及方法,提高产前超声检出率。资料与方法选择产前心脏大血管异常的323例胎儿,行胎儿超声心动图检
近两年,房地产开发企业的生存场景都在发生深刻变化,“强者恒强”的格局凸显,中小企业则面临大浪淘沙的拐点。然而,日子不好过的时候,正是中小企业逆袭的好时机。除了做大规
一.新课标中的词汇学习目标2003年4月教育部颁布的《普通高中英语课程标准》把中学英语词汇教学的最高标准定为八级,并对每个级别的词汇学习都作了目标描述以及词汇量的规定。