论文部分内容阅读
由湖南省水利水电勘测设计院设计、长江葛洲坝工程局承包施工的浏阳县株树桥水电站,于8月25日上午完成截流。长江葛洲坝工程局及省、市有关部门的负责同志出席
The Zhushuang Hydropower Station of Liuyang County, designed by Hunan Provincial Institute of Water Resources and Hydropower Survey and Design and contracted by the Gezhouba Engineering Bureau of Changjiang River, was closed on the morning of August 25. Gezhouba Engineering Bureau and the provincial and city departments responsible comrades attended