论文部分内容阅读
摘要:水电安装作为高层建筑的重要组成部分,其质量的好坏直接影响到建筑功能的使用,本文结合某高层建筑工程实例,对高层建筑水电安装质量问题进行了分析,并针对相关问题提出了一些控制措施,对同类高层建筑有一定的推广和借鉴作用。
关键字:高层建筑;水电安装;质量控制;防治措施
中图分类号:TU97 文献标识码:A 文章编号:
Introduction to a high-rise building hydropower installation quality control
Yu Biao1 (Chengdu Construction Co., Ltd., MCC19 610091)
Abstract: Hydropower installation as an important part of high-rise building, its quality directly affects the use of architectural features, this paper presents an example of a high-rise building project, water and electricity installation of high-rise building quality problem is analyzed, and puts forward some control measures for related problems, and for the promotion of similar high-rise buildings have certain reference.
Key words: High-rise building; Hydropower installation; The quality control; Control measures
1 引言
水电安装工程是高层建筑中不可或缺的重要组成部分,其安装质量的好坏直接影响人们的日常使用,如果安装过程中存在质量问题或隐患,特别是公共设备如:生活水泵、消防水泵、发电机、供配电房等,将对人们的日常生活及安全造成极大影响。严格把控水电安装质量对高层建筑的实际功用有着重大意义,因此,我们应对水电安装工程的质量控制予以足夠的重视。
2 工程概况
该高层建筑位于攀枝花市炳三区,北面,南面及西面紧邻主干道,东面与“市疾控中心”相邻。该工程由1区,2区主楼与3区,4区,5区,6区副楼组成,主、副楼地上分别34、21层,地下均为三层,分区布置图如图1所示,其中三区为主副楼连接通道,主楼部分塔楼高146.05m(超高层建筑)。
图1高层建筑分区图
建筑东西长约270m,南北宽约110m,工程总建筑面积为155524㎡;地下室管线布局复杂、设备众多,有大量平战时集水坑、发电机房、通风机房、水泵房、冷却机房、停车场及部份高低压配电室,对水电安装质量控制有一定的难度。
3水电安装质量控制的难点
高层建筑的水电安装项目具有非常高的综合程度与技术要求,施工难度非常大,具体表现在以下方面:
3.1地下室施工阶段
高层建筑,特别是超高层建筑的大部分重要设备通常设计并安装在地下室,设备与管线均较多(该高层建筑地下室各类管线长度总计超过十五万米),如果不进行科学规划和统筹计划,易导致各管线间发生矛盾与冲突,不仅会严重影响相关设备的使用,还会大大降低空间的利用率。所以,严格细致的事前控制必不可少,应该认真核对施工图纸,做到事前控制,发现问题要与设计人员进行及时地沟通。
该高层建筑三层地下室总建筑面积为37175㎡,预埋管线及预留洞口多而复杂,要从总体出发,充分考虑给排水管道、消防管道、通风管道、照明线管、应急线管、战时照明线管的预埋及预留位置,做到合理有效的利用有限的地下室空间。
3. 2裙楼及转换层施工阶段
该高层建筑主楼地上六层,副楼地上三层为裙楼部分,面积大而不规则,标高变化多样,梁、柱分布较密,管线敷设和走线问题比较棘手,且预留洞口多而分散。标准层以上给排水项目的洞口、套管、管线预留以及电气安装工程的走线基本一致,便于施工管理。水电安装工程质量的高低直接影响着建筑的使用效果和视觉观感,必须高度重视。所以在施工管理过程中,应当把裙楼及转换层部分作为水电安装质量控制的重点。
4 水电安装质量控制措施
在实际施工过程中,我们应做到以下几点以确保水电安装工程质量:1、项目开工前期认真做好图纸会审和施工方案的审核工作;2、施工前健全完善技术交底工作,把施工过程中的重难点对施工班组交代清楚;3、施工过程中充分发挥工程监理的作用,确保工程质量;4、建立起水电安装质量保证体系,做到隐蔽前班组的自检、项目部复检、监理甲方施工单位班组的联合检查三检制度;5、做好高层建筑水电安装的样板间引入制度,让施工班组参照实物标准施工。
该高层建筑水电安装质量控制措施具体如下:
4.1供水采用无负压变频设备与高位水箱结合技术
该高层建筑采用分区供水方式,其中低区直接利用市政管道供水;中区为了有效弥补传统供水方式的固有缺陷,现采用无负压变频供水技术;高区采用屋顶生活水箱加减压阀供水。带低位调节水箱的无负压变频设备,也称智能化无负压增压设备,可根据设定的城市余压自动更换水泵吸水侧的水源,在正常情况下水泵由城市管网直接吸水,当城市管网压力低于设定压力时,转换为水泵由低位调节水箱吸水。这样既保护了城市管网的正常供水,也保证了建筑物内部的正常供水。
4.2 新型塑料管材的选用
该高层建筑选用PVC-U硬聚氯乙烯管作为排水管,PVC-U管道和传统的管道相比,具有重量轻、耐腐蚀、水流阻力小、机械强度大、节约能源、安装迅捷、造价低等优点,受到大力推广应用,效益显著,对于大型高层建筑最为适合。
4.3 积极做好无卤低烟阻燃电力电缆的施工
该高层建筑大量选用WDZ-YJE(铜芯交联聚乙烯绝缘无卤低烟聚烯烃护套阻燃电力电缆),其主要特点是在电缆着火燃烧的情况下,释放出的烟雾浓度低、卤酸气体含量为零,广泛应用于高层建筑、地铁、地下通道、大型电站及重要工矿企业以及与防火安全消防救生有关的地方。相对于普通电缆,该电缆施工具有较大的难度,WDZ-YJE电缆具有更高的硬度和更大的重量,安装和敷设时不易达到平行整洁的观感效果。同时,工程具有较多的接头和较长的线路,给故障点的查找造成很大的困难,并且桥架内和进出配线箱处不容易弯曲成型。
结合该高层建筑工程实际情况,在电缆敷设过程中应严格做到:1.采用机械牵引与人工搬运相结合进行敷设,在整个过程中要禁止撞击与磕碰,严禁将电缆直接从车上扔下或滚下。2.选用放线盘缓慢放线,同时对电缆进行扳直。3.对已敷设电缆应及时固定,防止掉落或移位。4.严格按规范要求制作电缆终端头,预留好合适的线芯长度,做到端头布置科学合理、简洁大方。
5 结语
随着人们生活水平的提高,高层水电安装工程的要求不仅仅局限于满足于照明、用水、家电用电量、安全用电等需要,还应注重其美观、适用、方便的使用效果。 而水电安装的质量的好坏对建筑工程总体质量有长期的影响作用,本文根据多年的实际工作经验,探讨了几点关于高层建筑水电安装的质量控制的难点,通过各个环节的严格控制,在实际工程中取得了较好的效益,对同类高层建筑有一定的推广和借鉴作用。
参考文献:
[1]顾晓敏.水电安装中常见的质量问题的预控方法[J].科技创新导报,2009,(21);
[2]庄谓平.高层建筑水电安装质量控制的难点分析[J].建筑,2011, (16);
[3]江和.解析高层住宅水电安装工程中的质量问题与控制对策[J].项目管理与质量控制, 2013, (03);
[4] 李国燕.建筑水电安装施工质量控制措施探讨[J].科技创新与应用,2013, (23).
关键字:高层建筑;水电安装;质量控制;防治措施
中图分类号:TU97 文献标识码:A 文章编号:
Introduction to a high-rise building hydropower installation quality control
Yu Biao1 (Chengdu Construction Co., Ltd., MCC19 610091)
Abstract: Hydropower installation as an important part of high-rise building, its quality directly affects the use of architectural features, this paper presents an example of a high-rise building project, water and electricity installation of high-rise building quality problem is analyzed, and puts forward some control measures for related problems, and for the promotion of similar high-rise buildings have certain reference.
Key words: High-rise building; Hydropower installation; The quality control; Control measures
1 引言
水电安装工程是高层建筑中不可或缺的重要组成部分,其安装质量的好坏直接影响人们的日常使用,如果安装过程中存在质量问题或隐患,特别是公共设备如:生活水泵、消防水泵、发电机、供配电房等,将对人们的日常生活及安全造成极大影响。严格把控水电安装质量对高层建筑的实际功用有着重大意义,因此,我们应对水电安装工程的质量控制予以足夠的重视。
2 工程概况
该高层建筑位于攀枝花市炳三区,北面,南面及西面紧邻主干道,东面与“市疾控中心”相邻。该工程由1区,2区主楼与3区,4区,5区,6区副楼组成,主、副楼地上分别34、21层,地下均为三层,分区布置图如图1所示,其中三区为主副楼连接通道,主楼部分塔楼高146.05m(超高层建筑)。
图1高层建筑分区图
建筑东西长约270m,南北宽约110m,工程总建筑面积为155524㎡;地下室管线布局复杂、设备众多,有大量平战时集水坑、发电机房、通风机房、水泵房、冷却机房、停车场及部份高低压配电室,对水电安装质量控制有一定的难度。
3水电安装质量控制的难点
高层建筑的水电安装项目具有非常高的综合程度与技术要求,施工难度非常大,具体表现在以下方面:
3.1地下室施工阶段
高层建筑,特别是超高层建筑的大部分重要设备通常设计并安装在地下室,设备与管线均较多(该高层建筑地下室各类管线长度总计超过十五万米),如果不进行科学规划和统筹计划,易导致各管线间发生矛盾与冲突,不仅会严重影响相关设备的使用,还会大大降低空间的利用率。所以,严格细致的事前控制必不可少,应该认真核对施工图纸,做到事前控制,发现问题要与设计人员进行及时地沟通。
该高层建筑三层地下室总建筑面积为37175㎡,预埋管线及预留洞口多而复杂,要从总体出发,充分考虑给排水管道、消防管道、通风管道、照明线管、应急线管、战时照明线管的预埋及预留位置,做到合理有效的利用有限的地下室空间。
3. 2裙楼及转换层施工阶段
该高层建筑主楼地上六层,副楼地上三层为裙楼部分,面积大而不规则,标高变化多样,梁、柱分布较密,管线敷设和走线问题比较棘手,且预留洞口多而分散。标准层以上给排水项目的洞口、套管、管线预留以及电气安装工程的走线基本一致,便于施工管理。水电安装工程质量的高低直接影响着建筑的使用效果和视觉观感,必须高度重视。所以在施工管理过程中,应当把裙楼及转换层部分作为水电安装质量控制的重点。
4 水电安装质量控制措施
在实际施工过程中,我们应做到以下几点以确保水电安装工程质量:1、项目开工前期认真做好图纸会审和施工方案的审核工作;2、施工前健全完善技术交底工作,把施工过程中的重难点对施工班组交代清楚;3、施工过程中充分发挥工程监理的作用,确保工程质量;4、建立起水电安装质量保证体系,做到隐蔽前班组的自检、项目部复检、监理甲方施工单位班组的联合检查三检制度;5、做好高层建筑水电安装的样板间引入制度,让施工班组参照实物标准施工。
该高层建筑水电安装质量控制措施具体如下:
4.1供水采用无负压变频设备与高位水箱结合技术
该高层建筑采用分区供水方式,其中低区直接利用市政管道供水;中区为了有效弥补传统供水方式的固有缺陷,现采用无负压变频供水技术;高区采用屋顶生活水箱加减压阀供水。带低位调节水箱的无负压变频设备,也称智能化无负压增压设备,可根据设定的城市余压自动更换水泵吸水侧的水源,在正常情况下水泵由城市管网直接吸水,当城市管网压力低于设定压力时,转换为水泵由低位调节水箱吸水。这样既保护了城市管网的正常供水,也保证了建筑物内部的正常供水。
4.2 新型塑料管材的选用
该高层建筑选用PVC-U硬聚氯乙烯管作为排水管,PVC-U管道和传统的管道相比,具有重量轻、耐腐蚀、水流阻力小、机械强度大、节约能源、安装迅捷、造价低等优点,受到大力推广应用,效益显著,对于大型高层建筑最为适合。
4.3 积极做好无卤低烟阻燃电力电缆的施工
该高层建筑大量选用WDZ-YJE(铜芯交联聚乙烯绝缘无卤低烟聚烯烃护套阻燃电力电缆),其主要特点是在电缆着火燃烧的情况下,释放出的烟雾浓度低、卤酸气体含量为零,广泛应用于高层建筑、地铁、地下通道、大型电站及重要工矿企业以及与防火安全消防救生有关的地方。相对于普通电缆,该电缆施工具有较大的难度,WDZ-YJE电缆具有更高的硬度和更大的重量,安装和敷设时不易达到平行整洁的观感效果。同时,工程具有较多的接头和较长的线路,给故障点的查找造成很大的困难,并且桥架内和进出配线箱处不容易弯曲成型。
结合该高层建筑工程实际情况,在电缆敷设过程中应严格做到:1.采用机械牵引与人工搬运相结合进行敷设,在整个过程中要禁止撞击与磕碰,严禁将电缆直接从车上扔下或滚下。2.选用放线盘缓慢放线,同时对电缆进行扳直。3.对已敷设电缆应及时固定,防止掉落或移位。4.严格按规范要求制作电缆终端头,预留好合适的线芯长度,做到端头布置科学合理、简洁大方。
5 结语
随着人们生活水平的提高,高层水电安装工程的要求不仅仅局限于满足于照明、用水、家电用电量、安全用电等需要,还应注重其美观、适用、方便的使用效果。 而水电安装的质量的好坏对建筑工程总体质量有长期的影响作用,本文根据多年的实际工作经验,探讨了几点关于高层建筑水电安装的质量控制的难点,通过各个环节的严格控制,在实际工程中取得了较好的效益,对同类高层建筑有一定的推广和借鉴作用。
参考文献:
[1]顾晓敏.水电安装中常见的质量问题的预控方法[J].科技创新导报,2009,(21);
[2]庄谓平.高层建筑水电安装质量控制的难点分析[J].建筑,2011, (16);
[3]江和.解析高层住宅水电安装工程中的质量问题与控制对策[J].项目管理与质量控制, 2013, (03);
[4] 李国燕.建筑水电安装施工质量控制措施探讨[J].科技创新与应用,2013, (23).