“八五”期间,建成南浦大桥、杨浦大桥、奉浦大桥、延安东路隧道复线;完成内环线工程和南北向的成都路高架道路;拓宽和辟通几条东西向和南北向主干道,完成外滩交通综合改造;建成以杨高路、浦东大道、浦东南路为主的浦东新区道路网络;建成沪宁高速公路上海段;建成地铁1号线;建设一批停车场;逐步解决静态交通问题。
During the “Eighth Five-Year Plan” period, double-tracks were completed for the Nanpu Bridge, Yangpu Bridge, Fengpu Bridge, and Yan’an East Road tunnel; the Inner Ring Road project and the north-south direction of the Chengdu Road elevated road were completed; several east-west and north-south trunk roads were widened and provided. Completed the comprehensive transformation of the Bund traffic; built the road network of Pudong New Area, which mainly consists of Yanggao Road, Pudong Road and Pudong South Road; completed the Shanghai section of the Shanghai-Nanjing Expressway; built Metro Line 1; built a batch of parking lots; gradually solved static traffic problems.