瀑布沟水电站是国家“十五”重点工程和西部大开发标志性工程,是一座特大型水利水电枢纽工程。该电站装设6台混流式水轮发电机组,单机容量600MW,年平均发电量147.9亿kWh。工程于2004年3月开工建设,2009年底首批2台机组发电,到2010年12月26日最后一台机组发电。东方电机有限公司为其提供全部6台发电机和3台水轮机,由于我公司提供的水轮发电机组在电站运行中的良好表现和优良的售后服务,业主将“优秀制造单位”奖牌颁发给我公司,这也是业主授予电站设备供货商的唯一一块奖牌。
Pubugou Hydropower Station is a national “fifteen ” key project and the western development landmark project, is a large-scale water conservancy and hydropower hub project. The station is equipped with six Francis turbine units, single capacity of 600MW, the average annual generating capacity of 14.79 billion kWh. Construction started in March 2004 construction, the first batch of 2 units by the end of 2009 power generation, to December 26, 2010 the last unit generating. Dongfang Electrical Machinery Co., Ltd. provided all 6 generators and 3 hydraulic turbines. Due to the good performance and excellent after-sales service of hydro-generating set provided by our company in the operation of power station, the owners awarded “Excellent Manufacturing Unit” medals Give me the company, which is also the only piece of medal the owner has given to the station equipment supplier.