论文部分内容阅读
我矿目前用于生产的250升和150升采金船均为国产电动桩柱式采金船.其生产工艺过程是:斗链上的挖斗将工作面的矿砂挖下沿斗桥上移,卸至受料口,矿砂经送料口进入圆筒筛,在圆筒筛内经高压水冲洗碎解和筛分,筛下产品随矿浆进入选矿设备,尾矿经扫尾溜槽排入采池,精矿收取后送岸上选厂精选,筛上砂石经筒筛未端的砾石槽至主运输机,再由主运输皮带排至砾石堆.
At present, the 250-liter and 150-liter gold mining vessels used by our mine are all domestic electric pillared gold mining vessels whose production process is as follows: the bucket on the bucket chain digs the ore on the working face upwards along the bucket bridge , Unloaded to the receiving port, the ore through the feed port into the cylinder screen, high pressure water in the cylinder sieve crushing and screening, the sieve product with the pulp into the beneficiation equipment, tailings trough trough discharged into the pool, refined The ore is collected and sent to a pick-and-pick factory on the shore for screening. The gravel pits are screened by the gravel pits at the end of the screen to the main transporter, and then discharged by the main transport belt to the gravel piles.