论文部分内容阅读
广州南沙黄阁汽配工业园内河涌改道工程位于南沙黄阁镇,工程任务为与排涝水闸及排涝泵站组成排涝体系后,使汽配工业园的排涝标准达到20年一遇暴雨一天排干不成灾,工程级别为4级。黄阁汽配工业园内有新窖涌、西涌、三岗涌、乌洲涌、新海涌5条内河涌。为了满足生产厂区布置,对厂区内的河涌需进行重新布局。根据厂区规划,新窖涌需填埋,乌洲涌、西涌、新海涌需改道,3条河涌改道段长共计5.5km,土方开挖总量约28万m3,总投资约7000万元。
Guangzhou Nansha Huangge Auto Parts Industrial Park in the river diversion project is located in Huangsha Town, Nansha, the task of the project with draining sluice and drainage pump station drainage system, the auto parts industrial park drainage standards up to 20 years, once a day storm drained Disaster, engineering level 4. Huang Ge Auto Parts Industrial Park, a new cellar Chung, West Chung, three Gang Chung, Wu Chau Chung, the new five Chung Hai Chung River. In order to meet the layout of the production plant, the rivers in the plant area need to be rearranged. According to the planning of the plant site, the new creek need to be landfilled. Wuzhou Bay, Xiyong and Xinhai will need to be diverted. The three river diversion sections have a total length of 5.5km. The total amount of earth excavation is about 280,000 m3, with a total investment of 70 million yuan .