通过在现场施工及经营部工作过程中,对钱江通道及接线工程南接线益农互通(45+75+45)m主桥由挂篮悬臂施工改为支架施工的方案比选。
Through the on-site construction and operation of the Ministry of construction process, the Qianjiang channel and wiring project South Wiring Interchange (45 +75 +45) m main bridge from hanging basket cantilever construction to stent construction program comparison and selection.