论文部分内容阅读
本文简要介绍了UEA无缝设计施工新方法的理论依据和大面积无缝施工实例,及以UEA膨胀加强带取代后浇缝实现任意长构筑物连续浇筑作业的经验。
This paper briefly introduces the theoretical basis of the new method of seamless design and construction of UEA and the application of large-area seamless construction, and uses UEA expansion reinforcement to replace the post-sealing joint to achieve the continuous pouring operation of any length of structures.