论文部分内容阅读
该高炉工艺采用卢森堡P.W公司的无料钟炉顶装料技术,其电气传动控制是高炉控制的难点,直接关系到高炉能否按设计要求进行生产。
The blast furnace process using Luxembourg P.W bellless top charging technology, the electrical drive control is the difficulty of blast furnace control, is directly related to the blast furnace according to design requirements for production.