目前,我国国内建成或已经封顶的超高层建筑超过了3000座,建筑主体范围内的配电工程常与土建工程具有一定的整体性和不可分割性,同时建筑低压配电柜出线端子以后的电压属于低压范围,属于房建类施工企业可承担的业务范围。文章从招标范围和标段划分、资格条件设置、关键设备的推荐品牌设置、控制价设置、评标方法设置、中标通知书的发放等六个方面介绍了超高层建筑供配电工程施工招标采购的基本流程和操作要点,为业界更好地开展超高层建筑的供配电工程施工招标采购提供了有益借鉴。
At present, over 3,000 high-rise buildings have been built or capped in our country, and the power distribution projects within the main body of buildings often have certain integrity and indivisibility with civil works. At the same time, the voltage after the outlet terminals of low-voltage distribution cabinet Belongs to the low pressure range, belongs to the housing construction class enterprise can afford the business scope. The article introduces the construction bidding and procurement of super high-rise buildings for power supply and distribution projects from the aspects of the scope of tenders and the division of tenders, the setting of qualification conditions, the recommended brand settings of key equipment, the setting of control prices, the setting of evaluation methods and the issuance of successful biddings. The basic processes and operational points for the industry to better carry out construction of high-rise building for the bidding and procurement of power supply provides a useful reference.