Distribution of organochlorine pesticides and polychlorinated biphenyls in Ny-(A)lesund of the Arcti

来源 :极地研究(英文版) | 被引量 : 0次 | 上传用户:Joetty
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
Sediment, moss and animal-dropping samples were collected from pesticides (OCPs) and polychlorinated biphenyls (PCBs) in the Arctic area. OCPs and PCBs were analyzed using the capillary gas chromatography (GC-ECD). Recoveries of three surrogates were at a range of 69.5~92.2% (mean: 78.8%), 75.1~112.1% (98.5%) and 67.7~95.1% (79.5%), and the relative standard deviations were 6.7%, 8.0% and 11.3%, respectively. The major monomers of OCPs were hexachlorocyclohexanes (HCHs) and DDTs. Their concentrations were at a range of 0.86~4.50 ng/g (mean: 2.24 ng/g) and 0.22~1.09 ng/g (mean: 0.55 ng/g). The concentrations of PCBs were 0.20~3.25 ng/g (mean: 0.84 ng/g) and the major congeners were tetra-, penta-, and hexa-PCBs, which were up to 23.8%、26.7% and 32.3% of total PCBs, respectively. Based on the results of the ratio analysis and the principal component analysis, the atmospheric transport is believed be one
其他文献
本文是作者通过近几年工作经验总结的,主要对城市规划管理方面进行了简单的论述。
针对于建筑工程建设项目管理而言,工程设计、投资决策、建设施工以及招标投标等多个阶段,涉及经济技术管理的各个方面。项目决策是决定因素,而设计则是关键因素。因此,做好工程造
本论文主要以天津数字大厦为案例,分析政府投资建设项目从前期策划到设计阶段、招标阶段、施工阶段、竣工验收及结算各阶段如何做好全过程成本管理领域的应用问题。首先分析和
工程项目管理是以建设项目为对象,以工期、质量、投资控制、安全等目标为主要内容,把各种知识、技能、手段和技术应用于项目中,以达到人们的需要和期望的生产组织管理。按建设工
本文通过海北铝厂项目施工条件的特点描述;阐述了项目成本控制的内涵,提出了成本控制的具体措施,从而确保了施工企业在不利的施工环境中对施工成本的合理控制。
随着我国采矿企业机械化应用程度的不断提高,在生产过程中直流供电系统常会有杂散电流存在,导致因对杂散电流管理不善造成火灾事故。本文针对露天矿开采中供电系统中杂散电流的
园林工程的兴起是建设现代文明城市所必须的,生活水平的提高代表着园林工程也面临着非常大的机遇和挑战。紧跟时代是园林行业发展的需要,这也有利于提高竞争力和市场适应力。本
近年来,我国的大型超市发展非常迅速,数量也在不断增加,成为市民日常购物的主要场所之一。在现代大型超市的运营中,合理的卖场布局是一种重要的推销方式,能够有效提高消费者的购买
地图匹配能够将车辆定位信息与路网电子地图相结合,是车辆导航系统中重要的定位技术.首先简要介绍和分析基于自适应模糊神经网络的C-Measure地图匹配算法及其优点,算法中的C-
浙江省淳安县新安江开发总公司经营千岛湖周边3.3万hm2山林,文章根据IMO(瑞士市场生态研究所)对其进行预评估,就千岛湖林区开展FSC体系森林认证的意义和森林经营状况进行了分