HI-13串列加速器升级工程2010年在初步设计、建筑施工图设计、大型设备加工制造、执照申领、文件编评工作均取得了重大进展。1初步设计获得批复,建筑施工图设计完成串列升级工程初步设计于9月3日获得国防科工局批复。初步设计批复后,工程部立即组织设计单位开展了施工图设计工作,11月建筑施工图完成。2主工艺系统部分大型关键设备订货,工程取得重要进展回旋加速器关键设备制造、加工进展顺利。1)主磁铁系统:完成主磁铁加工制造;2)主磁铁
HI-13 Tandem Accelerator Upgrade Project In 2010, significant progress has been made in the preliminary design, construction drawing design, large-scale equipment manufacturing, license application and document review. 1 The preliminary design was approved, and the preliminary design of the construction drawing design completed the serial upgrade project was approved by the National Defense Science and Technology Bureau on September 3. After the preliminary design approval, the engineering department immediately organized the design unit to carry out the construction drawing design work and completed the construction drawing in November. 2 The main process system Some of the major key equipment orders, the project made significant progress Cyclotron key equipment manufacturing, processing progressing smoothly. 1) The main magnet system: complete the main magnet manufacturing; 2) the main magnet