论文部分内容阅读
白盆珠电站位于广东省惠东县境内。装机容量为2×12000千瓦。采用HL240-LJ-225型水轮机及SF-K1.2-32/5500(悬式)发电机。该电站一九八五年四月试运行,其间两台机均发生推力轴承烧瓦事故。机组推力轴承形式为刚性支柱螺纹式,轴瓦八块。满负荷时轴向推力175吨,单位压力2.109MPa。平均周速9.23米/秒。偏心值17毫米,偏心率5.85%。镜板尺寸φ1280×φ600×98毫米。一号机在进行规定的空载试验期间,运行情况良好,各项指标均达部颁标准。瓦温
White Basin Power Station is located in Huidong County, Guangdong Province. Installed capacity of 2 × 12000 kilowatts. Using HL240-LJ-225 turbine and SF-K1.2-32 / 5500 (suspension) generator. The plant was commissioned in April 1985, during which two thrust bearing bush burning accidents occurred. Thrust bearing units in the form of rigid struts threaded, bearing eight. Axial thrust at full load 175 tons, unit pressure 2.109MPa. The average speed of 9.23 m / s. Eccentricity 17 mm, eccentricity 5.85%. Mirror plate size φ1280 × φ600 × 98 mm. During the no-load test on the 1st aircraft, the operation was in good condition with all the indicators meeting the ministerial standards. Wawen