论文部分内容阅读
黑龙江省水文总站秦家中心水文站为了严格貫彻执行规范,在流量測驗工作中建立了“船头会”制度。在每次測流前,由本次測流負責人主持,根据当时水情,研究测流具体方案,提出质量要求和施测过程中应注意的問題,并作好組織分工,明确責任;測流完后开一次“船头会”,按照规范标准来总結本次测驗工作,衡量測驗成果质量,找經驗,找差距和問題,以便进一步提高。发現有不符合精度要求的,立即就地复測,以保証資料质量。对于每一个人,則根据规范规定检查自己在本次測驗中不足之处,并研究改进。从一九六四年五月下旬到七月末,每次測流前后
In order to strictly implement the code of practice, the hydrological station of the Qin Center of the Hydrological Station of Heilongjiang Province established the “bow club” system in the flow test work. Before each flow measurement, the person in charge of the flow measurement is in charge of the project. According to the current situation of water flow, the specific plan of flow measurement is studied, the quality requirements and the problems to be noticed in the process of measurement are put forward, and the division of labor and responsibility are clearly defined After the flow of open a “bow will be” in accordance with norms to summarize the test work to measure the quality of test results, find the experience, find the gaps and problems in order to further improve. Found to meet the accuracy requirements, and immediately retest in situ to ensure the quality of the data. For each individual, according to the rules and regulations to check their deficiencies in this test, and to study and improve. From late May 1964 to the end of July, before and after each measurement