杭州江洋畈生态公园采用新型补偿基础PE管作为木栈桥下基础,因修筑在深厚西湖疏浚软土上易产生过大沉降,造成安全隐患,需要对新型基础施工期及工后沉降进行深入的研究。本论文采用修正剑桥模型,利用ABAQUS有限元分析软件分析研究该新型基础自施工开始的沉降变化。结果表明,在该软土地基上,PE管基础呈现出刚性基础的变化分布特征;土体10年堆填时间内总沉降2.092m,栈桥施工30年后土体又发生了1.6m的沉降,与基础沉降差在5.0cm左右,整体沉降变化均在可接受范围内,对基础的安全影响甚微。土体及基础的沉降随时间增长,初期基本成线性分布规律,直至栈桥施工5年后速率开始下降,后趋于稳定,但是沉降稳定需要时间相当长。
Hangzhou Yangyang Ecological Park adopts the new compensation foundation PE pipe as the foundation under the wooden trestle. Due to the excessive settlement caused by the construction on the deep West Lake dredging soft soil, it is a potential safety hazard. Therefore, it is necessary to conduct in-depth study on the new-type foundation construction period and post-construction settlement the study. In this paper, a revised Cambridge model is used to analyze the settlement change of the new foundation from the beginning of construction by using ABAQUS finite element analysis software. The results show that on the soft soil foundation, the PE pipe foundation exhibits a rigid foundation of variation distribution characteristics. The total settlement of the soil body within 2.0 years is 2.092m. After 30 years of trestle construction, there is an additional 1.6m of settlement. The difference with the foundation settlement is about 5.0cm, the overall settlement changes are within the acceptable range, little impact on the basic safety. The subsidence of soil and foundation increases with time. The initial distribution is basically linear. The velocity begins to decline after 5 years of trestle construction and tends to be stable afterwards. However, it takes quite a long time to stabilize the settlement.