阐述了600 MW 超临界压力锅炉垂直一次上升水冷壁水动力特性的研究结果,根据计算结果探讨了合适的节流圈组合方式和节流圈尺寸的选择,使水冷壁在各负荷下都获得满意的出口汽温分布,并对水冷壁系统的壁温分布进行了计算,从而保证在所有负荷下水冷壁系统的金属壁温处在允许范围之内。并在此基础上,论证了600 MW 超临界压力变压运行锅炉采用垂直管圈水冷壁的可能性。
The hydrodynamic characteristics of a vertical rising water wall of a 600 MW supercritical pressure boiler are discussed. Based on the results of the calculation, suitable choke ring combinations and choke ring dimensions are selected, and the water wall is satisfied under various loads Of the outlet steam temperature distribution, and the wall temperature distribution of the water wall system was calculated to ensure that the metal wall temperature of the water wall system under all loads within the allowable range. On this basis, the feasibility of vertical wall ring waterwall in 600 MW supercritical pressure transformer operating boiler is demonstrated.