论文部分内容阅读
1983年4月我院提出《黄河干流龙羊峡~青铜峡河段梯级开发规划报告》,将该河段规划布置为龙羊峡、拉西瓦、李家峡、公伯峡、积石峡、寺沟峡、刘家峡、盐锅峡、八盘峡、小峡、大峡、乌金峡、小观音、大柳树、青铜峡等十五个梯级,可利用最大水头共1073米,保证出力456万千瓦,装机容量1246.4万千瓦,年发电量500.6亿度,其中在建和已建的龙、刘、盐、八、青等五个梯级水电站,已利用最大水头343.5米(占全河段的32%,下同)、保证出力146.1万千瓦(32%)、装机容量324.4万千瓦(26%)、
In 1983 April our hospital proposed “the Yellow River mainstream Longyangxia ~ Qingtongxia cascade development planning report”, the layout of the section of the layout of Longyangxia, Laxiwa, Lijiaxia, Gongboxia, Jishixia, Temple Dapingxia, Liujiaxia, Yanghuoxia, Bapanxia, Xiaoxia, Daxia, Wujinxia, Xiao Guanyin, Daliushu, Qingtongxia and other fifteen steps, the maximum available head of 1073 meters, to ensure that the output of 4.56 million kilowatts, installed Capacity of 12.464 million kilowatts, annual generating capacity of 50.06 billion degrees, of which five hydropower stations under construction and built, such as Long, Liu, Yan, Ba, Qing, have utilized the maximum head of 343.5 meters (accounting for 32% of the whole river section, The same), to ensure that output of 1,461,000 kilowatts (32%), installed capacity of 3 324.4 kilowatts (26%),