论文部分内容阅读
介绍了大跨度混凝土斜拉桥牵索挂篮施工工艺的特点,建立了牵索挂篮施工模拟计算的流程,并对牵索方案的选择以及主梁立模标高的确定等问题进行了探讨。作为工程实例,文中还给出了某在建斜拉桥的施工流程及其计算结果。
This paper introduces the construction process of the cable-stayed crane with long-span concrete cable-stayed bridge, establishes the flow of simulation calculation of the cable-stayed crane construction, and discusses the options of the cable and the determination of the vertical elevation of the main girder. As an example of the project, the construction process of a cable-stayed bridge under construction and its calculation results are also given.