论文部分内容阅读
山钢集团济钢公司炼铁厂针对具有自主知识产权的400 m2烧结机余热发电系统积极开展技术攻关,采用六西格玛先进管理模式对热能提取和发电设备作业率进行流程分析,先后实施了烧结机头电除尘气力输灰系统、带冷机台车密封等多项重大改进,完善了一系列管理标准和制度,烧结余热发电实现了持续、稳定、安全、高效运行,设备国产化率达到
Iron and Steel Co., Ltd. Jinan Iron and Steel Company Iron and Steel Company with independent intellectual property rights for the 400 m2 sintering machine waste heat power generation system to actively carry out technical research, the use of advanced management of Six Sigma thermal extraction and power plant operating rate for process analysis, has implemented a sintering head A series of major management standards and systems have been perfected and a series of management standards and systems have been perfected. The sintering waste heat power generation has achieved continuous, stable, safe and efficient operation with the localization rate of equipment reaching