论文部分内容阅读
内容摘要::伴随着时代的发展,建筑与安装业均得到了迅猛的发展。然而作为安装业重要的组成部分,建筑工程中的电气安装得到了越来越多的重视。而建筑工程的电气安装质量是直接影响到其工程的质量,并是其建筑工程的一个重要质量指标,在施工前一定要掌握住电气施工的主要技术点,并且加强其工程的质量管理与控制。本文则是对待建筑工程中的电气施工这项技术进行浅析及个别相关问题的探讨。
关键词:电气施工,控制与安装,技术要点;
Content abstract: : along with the development of The Times, the construction and installation are industry has developed rapidly. However as installation industry important part of the construction project of the electrical installation and get more and more attention. But the building project of electrical installation quality is directly affect the quality of the project, and is the construction of an important quality index, in before construction must grasp the main technical points of the electric construction, and strengthen its engineering quality management and control. This paper is to building project of the electrical construction the technology and individual guide-subject related question discussion.
Keywords: electrical construction, control and installation, main technical points;
中圖分类号:TU74文献标识码:A 文章编号:
随着时代的进步与发展,电气的范围和内容也与时俱进,而在当前,电气的安装工程已经成为了民用建筑工程中的一项重要且必不可缺的部分。要最大化的完善技术措施与强力健全管理手段,而使电气工程的承包质量低劣、粗糙等种种的情况得以在根本上得到解决,必要彻底的消除工程质量方面的事故与工程质量中的通病,关键是还在于如何能把施工人员在技术这方面的素质得以提高,还有提高施工人员的施工现场的技术与质量管理的水平。掌握住各种电气的安装技术把握好各方面的问题,强化建筑工程中电气安装的质量控制。
1、安装与施工之前的技术掌控
由电气设计相关人员根据建筑项目的安装设计提出与之相关联技术要求。在会同现场的技术施工人员进行核对安装与施工的图纸,避免出现不必要的遗漏与误差,安装电气的工人应该施工图纸要达到会看图读懂图。在电气安装施工之前,需要对电气安装的施工方法与进度计划做一个详细的了解,尤其是对地面、屋面、柱、梁等方面的做法与其相互间的各连接方式,并且要仔细的校核自己所准备要进行采用的这种电气安装的方法是否能和这一项目中电气的安装施工相匹配。在安装施工之前.还必须要加工与制作和备齐在电气安装的施工阶段中所需要的各种预埋件与预埋管道还有零配件等各种的基本设备。
2、配电设备的安装工艺
2.1、配电箱的职能
配电箱的它职能是对电能的接受与电能表量的分配,也是对电力的负荷在现场控制的直接控制器。想要能使工程中的照明、动力和弱电负荷能够正常的工作,然而配电箱其工作性能是至关重要的。工程中配电箱的型号量多且杂,其中大部分的配电箱还受到消防、楼宇等弱电专业控制,且箱内的原理很复杂、设制之非常严格。
2.2、配电箱的导线连接
而配电箱中连接导线的施工必须要使其牢固且紧密。箱体中要有安全且可靠的中性线的接线端子与保护接地的接线端子。并且按照规范的相关要求,电气元件和导线的接线端子连接必须是要配装弹簧垫圈的,并且是要达到牢固而紧密的质量标准。连接电源进线、导线与负荷出线和电气元件间的连接必须要精密而牢固且不松动。
2.3、配电箱安装后的清洁
在施工时应保持住配电箱内外的整洁性,箱面编号一定要标准清晰。配电箱在安装施工完以后要马上清除掉箱内外的杂物与碎屑保持好配电箱内外的干净与整洁。
3、管路的敷设技术
3.1、管路敷设之前的准备
首先在施工结构框架中的预埋施工中,施工人员都要对图纸进行认真的熟悉,必须要严格的按照设计中要求的管线型号、规格及敷设的方式来对管路的敷设进行施工。在根据图纸上的设计要求,在配合做好各楼层之间的暗管敷设的施工工程。要在混凝土的垫层施工完成了24小时之后,立即的拆除掉出线口处分线盒上的用于封堵其的塑料盖装置,彻底的清除掉管路线槽内所存积的水与杂物,在合理的用热风按照系统来将线槽的内部吹干,使线槽的内部清洁而干燥。
3.2、敷设线缆的原则
线槽内的导线总截面应不要超过线槽内的截面的30%。强电与弱电同路间的设置应该分槽来进行敷设,同一路径之间不同回路代表的绝缘导线需设置在同一个线槽内,但是同一个线槽内的强电回路要必须能够同时的切断施工电源,而不同电压的回路交叉时候应该在分线盒处来采用金属隔板进行隔开处理,线缆在敷设完毕后应该要及时的进行检查与检测处理。
4、建筑物上的防雷工艺
建筑结构的基本形式均为钢筋混凝土的结构,钢结构连接是采用了焊接与螺栓连接,而钢筋混凝土的结构内主钢筋则采用的是直螺纹连接和焊接连接,所有的金属件连接间的方式与截面均都满足防雷规范中的要求,并且与屋面的焊接连通,可以直接的做为防雷等电位的连接系统引下线,引下线与基础接地装置焊接。
如果建筑外墙都为幕墙结构,而建筑物在从室外的地坪起,每一层的外墙处来用结构圈梁间的内外侧的两根主钢筋的焊接来连通成环形来作均压环、并预留出接地端子板,将外墙上幕墙的框架等所有的金属性构筑物都接入到均压环接地的系统,每一个金属物接入不能少于两点,对侧击雷的破坏进行防止。
5、防雷安装的工艺
5.1、支持卡应牢固固定、间距且均匀。避雷带跨越了建筑物的伸缩缝和沉降缝处应该设置补偿器,而补偿器可以用接地线本身来弯成弧状进行代替。
5.2、据GB50057-1994(2007)《建筑物防雷设计规范》中规定,建筑物的顶部避雷针与避雷带等都必须和顶部外露处的其他金属物连接成一个电气通路的整体,与避雷引下线要连接可靠,来以防止静电的危害。
5.3、焊接面焊好以后,将药皮处理干净,镀锌层被破坏处应该做二次的防腐处理。
5.4、减小接地的电阻,一是增加了接地极的根数;二是如何使用化学药品。
总结:在建筑这个高风险的行业中,其中电是重中之重。而电器的安装达到什么样的质量,便成为了整个工程之中的一项重要环节,并且安装好与坏是与工程的整体质量和验收相挂钩的,情况严重的还将会危及到用户们的生命和财产的安全。因此对电气安装的施工与设计人员也就相应的把要求提的更高了,电气的安装工程一定要抓好质量管理,对工程的质量要得到确保,其安全性一定要可靠,并要保证建筑的整体运行与其先进性、稳定性。
参考文献:
[1].赵世新、向军.建筑机电安装工程施工管理技术[J].山西建筑.2008(2)
[2].李毅.浅谈对建筑电气施工技术的探讨与研究[J].黑龙江科技信息.2009(3)
[3].王峰.浅析建筑电气安装工程与土建工程的施工配合[J].山西建筑.2009(22)
[4].冯立斌.浅析建筑电气安装工程中的问题与改善措施[J].科技创新导报.2009(7)
[5].刘伟军.建筑电气安装的技术探讨[J].广东科技.2009(10)
关键词:电气施工,控制与安装,技术要点;
Content abstract: : along with the development of The Times, the construction and installation are industry has developed rapidly. However as installation industry important part of the construction project of the electrical installation and get more and more attention. But the building project of electrical installation quality is directly affect the quality of the project, and is the construction of an important quality index, in before construction must grasp the main technical points of the electric construction, and strengthen its engineering quality management and control. This paper is to building project of the electrical construction the technology and individual guide-subject related question discussion.
Keywords: electrical construction, control and installation, main technical points;
中圖分类号:TU74文献标识码:A 文章编号:
随着时代的进步与发展,电气的范围和内容也与时俱进,而在当前,电气的安装工程已经成为了民用建筑工程中的一项重要且必不可缺的部分。要最大化的完善技术措施与强力健全管理手段,而使电气工程的承包质量低劣、粗糙等种种的情况得以在根本上得到解决,必要彻底的消除工程质量方面的事故与工程质量中的通病,关键是还在于如何能把施工人员在技术这方面的素质得以提高,还有提高施工人员的施工现场的技术与质量管理的水平。掌握住各种电气的安装技术把握好各方面的问题,强化建筑工程中电气安装的质量控制。
1、安装与施工之前的技术掌控
由电气设计相关人员根据建筑项目的安装设计提出与之相关联技术要求。在会同现场的技术施工人员进行核对安装与施工的图纸,避免出现不必要的遗漏与误差,安装电气的工人应该施工图纸要达到会看图读懂图。在电气安装施工之前,需要对电气安装的施工方法与进度计划做一个详细的了解,尤其是对地面、屋面、柱、梁等方面的做法与其相互间的各连接方式,并且要仔细的校核自己所准备要进行采用的这种电气安装的方法是否能和这一项目中电气的安装施工相匹配。在安装施工之前.还必须要加工与制作和备齐在电气安装的施工阶段中所需要的各种预埋件与预埋管道还有零配件等各种的基本设备。
2、配电设备的安装工艺
2.1、配电箱的职能
配电箱的它职能是对电能的接受与电能表量的分配,也是对电力的负荷在现场控制的直接控制器。想要能使工程中的照明、动力和弱电负荷能够正常的工作,然而配电箱其工作性能是至关重要的。工程中配电箱的型号量多且杂,其中大部分的配电箱还受到消防、楼宇等弱电专业控制,且箱内的原理很复杂、设制之非常严格。
2.2、配电箱的导线连接
而配电箱中连接导线的施工必须要使其牢固且紧密。箱体中要有安全且可靠的中性线的接线端子与保护接地的接线端子。并且按照规范的相关要求,电气元件和导线的接线端子连接必须是要配装弹簧垫圈的,并且是要达到牢固而紧密的质量标准。连接电源进线、导线与负荷出线和电气元件间的连接必须要精密而牢固且不松动。
2.3、配电箱安装后的清洁
在施工时应保持住配电箱内外的整洁性,箱面编号一定要标准清晰。配电箱在安装施工完以后要马上清除掉箱内外的杂物与碎屑保持好配电箱内外的干净与整洁。
3、管路的敷设技术
3.1、管路敷设之前的准备
首先在施工结构框架中的预埋施工中,施工人员都要对图纸进行认真的熟悉,必须要严格的按照设计中要求的管线型号、规格及敷设的方式来对管路的敷设进行施工。在根据图纸上的设计要求,在配合做好各楼层之间的暗管敷设的施工工程。要在混凝土的垫层施工完成了24小时之后,立即的拆除掉出线口处分线盒上的用于封堵其的塑料盖装置,彻底的清除掉管路线槽内所存积的水与杂物,在合理的用热风按照系统来将线槽的内部吹干,使线槽的内部清洁而干燥。
3.2、敷设线缆的原则
线槽内的导线总截面应不要超过线槽内的截面的30%。强电与弱电同路间的设置应该分槽来进行敷设,同一路径之间不同回路代表的绝缘导线需设置在同一个线槽内,但是同一个线槽内的强电回路要必须能够同时的切断施工电源,而不同电压的回路交叉时候应该在分线盒处来采用金属隔板进行隔开处理,线缆在敷设完毕后应该要及时的进行检查与检测处理。
4、建筑物上的防雷工艺
建筑结构的基本形式均为钢筋混凝土的结构,钢结构连接是采用了焊接与螺栓连接,而钢筋混凝土的结构内主钢筋则采用的是直螺纹连接和焊接连接,所有的金属件连接间的方式与截面均都满足防雷规范中的要求,并且与屋面的焊接连通,可以直接的做为防雷等电位的连接系统引下线,引下线与基础接地装置焊接。
如果建筑外墙都为幕墙结构,而建筑物在从室外的地坪起,每一层的外墙处来用结构圈梁间的内外侧的两根主钢筋的焊接来连通成环形来作均压环、并预留出接地端子板,将外墙上幕墙的框架等所有的金属性构筑物都接入到均压环接地的系统,每一个金属物接入不能少于两点,对侧击雷的破坏进行防止。
5、防雷安装的工艺
5.1、支持卡应牢固固定、间距且均匀。避雷带跨越了建筑物的伸缩缝和沉降缝处应该设置补偿器,而补偿器可以用接地线本身来弯成弧状进行代替。
5.2、据GB50057-1994(2007)《建筑物防雷设计规范》中规定,建筑物的顶部避雷针与避雷带等都必须和顶部外露处的其他金属物连接成一个电气通路的整体,与避雷引下线要连接可靠,来以防止静电的危害。
5.3、焊接面焊好以后,将药皮处理干净,镀锌层被破坏处应该做二次的防腐处理。
5.4、减小接地的电阻,一是增加了接地极的根数;二是如何使用化学药品。
总结:在建筑这个高风险的行业中,其中电是重中之重。而电器的安装达到什么样的质量,便成为了整个工程之中的一项重要环节,并且安装好与坏是与工程的整体质量和验收相挂钩的,情况严重的还将会危及到用户们的生命和财产的安全。因此对电气安装的施工与设计人员也就相应的把要求提的更高了,电气的安装工程一定要抓好质量管理,对工程的质量要得到确保,其安全性一定要可靠,并要保证建筑的整体运行与其先进性、稳定性。
参考文献:
[1].赵世新、向军.建筑机电安装工程施工管理技术[J].山西建筑.2008(2)
[2].李毅.浅谈对建筑电气施工技术的探讨与研究[J].黑龙江科技信息.2009(3)
[3].王峰.浅析建筑电气安装工程与土建工程的施工配合[J].山西建筑.2009(22)
[4].冯立斌.浅析建筑电气安装工程中的问题与改善措施[J].科技创新导报.2009(7)
[5].刘伟军.建筑电气安装的技术探讨[J].广东科技.2009(10)