吉林石化乙二醇厂乙二醇装置自2009年5月二氧化碳脱除项目改造后,装置更换使用了更高选择性的催化剂。随着装置物耗大幅下降的同时,蒸汽消耗量有了较大幅度增加,两块蒸汽计量仪表显示装置蒸汽消耗量出现较大偏差,作为占装置综合能耗六成以上比例的蒸汽消耗,其数据准确性直接影响着装置班组成本核算、综合能耗分析以及优化生产。针对该问题,本文从仪表计量方式差异性、装置蒸汽消耗平衡、计量工况差异性等方面进行深入分析,试探性的探讨了蒸汽计量产生偏差的原因。针对产生偏差的原因,提出了改进措施,为装置蒸汽消耗量的更加准确计量提供帮助,同时也为存在类似问题的装置提供借鉴。
Jilin Petrochemical ethylene glycol plant ethylene glycol plant Since May 2009 carbon dioxide removal project transformation, the replacement of the device using a more selective catalyst. As the consumption of equipment dropped drastically, the steam consumption increased greatly. Two steam meters showed a large deviation of the steam consumption of the steam generator. As the steam consumption accounted for more than 60% of the total energy consumption of the steam generator, the data Accuracy directly affects the unit cost accounting, comprehensive energy analysis and production optimization. In view of this problem, this article carries on the thorough analysis from the aspects such as the difference of the measuring mode of the instrument, the equilibrium of the steam consumption of the apparatus, the differences of the measuring conditions, and tentatively discusses the reason of the deviation of the steam metering. Aiming at the reasons of the deviation, some measures for improvement are put forward, which can help to calculate the steam consumption of the plant more accurately, and provide a reference for the devices with similar problems.