论文部分内容阅读
受前期持续强降雨影响,2016年7月3日,太湖水位达到4.65m,1999年大水后,时隔16年,太湖再次发生超标准洪水。7月8日20时,太湖水位达到4.87m,逼近1999年大水时4.97m的历史最高值。面对历史罕见的持续暴雨和特大洪水,国家防总、太湖防总和流域各省(直辖市)精心组织,周密安排,强化应急值守和会商分析,及时启动应急响应,加强骨干工程调度,防汛抗洪工作有力有序展开。按照《太湖流域2016年超标准洪水应对方案》,防汛抗洪工作统筹区域与流域,兼顾上下游、左右岸、省
Due to the continuous heavy rainfall in the previous period, on July 3, 2016, the water level in Taihu Lake reached 4.65m. After the flood in 1999, it lasted 16 years and the over-standard flood occurred again in Taihu Lake. At 20:00 on July 8, the Taihu Lake water level reached 4.87m, approaching the historical high of 4.97m at the time of the flood in 1999. Faced with the rare continuous heavy rainfall and extra-large floods in history, the State Prevention Office and the provinces and municipalities directly under the Central Government and the provinces, municipalities and autonomous regions in Taihu Lake Basin have meticulously organized and meticulously arranged emergency calls and consultations, promptly started emergency response, strengthened key project scheduling and flood control and flood fighting Work effectively and orderly. In accordance with the “Taihu Lake Basin in 2016 to exceed the standard flood response plan”, flood control and flood fighting work to co-ordinate the region and catchment, taking into account the upstream and downstream, left and right bank, province