南水北调中线工程总干渠全长1427.17Km,其中涉及土石方填筑工程量近亿万m3,因此工程建设的质量检测尤为关键,然而常规检测手段效率较低,不利于工程的进度和成本。文章重点阐述了核子密度仪法和环刀法在南水北调某工程中的对比分析,通过数学模型分析和现场试验论证核子密度仪的可行性。
The total length of the main canal of the mid-route of the South-to-North Water Diversion Project is 1427.17Km, of which about hundreds of millions of m3 are involved in earth-rockfill construction. Therefore, the quality inspection of construction projects is particularly crucial. However, the conventional detection methods are inefficient and not conducive to the progress and cost of the project. This article focuses on the comparative analysis of the nuclear densimeter method and the ring knife method in a project of South-to-North Water Diversion. The feasibility of nuclear densitometry is demonstrated by mathematical model analysis and field test.