尼泊尔库里卡尼二级电站压力钢管的焊接和检验

来源 :水电站机电技术 | 被引量 : 0次 | 上传用户:ahdx2009
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
一工程概况库里卡尼二级电站位于尼泊尔王国中部地区离加德满都西南约30公里处RAPTI河上游盆地。整个库里卡尼工程是一个水电开发项目,分库里卡尼河上的一级电站和RAPTI河上的二级电站。库里卡尼一级电站水库的净库容为7300万立方米,可作为季调节,装机容量为6万千瓦,1982年初建成发电。库里卡尼二级电站将利用一级电站发电后的水量和RAPTI河支流满都(MANDU)河的自然 Project Overview The Curician Station II is located in the upper reaches of the RAPTI River, about 30 km southwest of Kathmandu in the Central Kingdom of Nepal. The entire Curiacan project is a hydropower development project, a sub-station on the Curiacani River and a second-level station on the RAPTI River. The net capacity of Kurikane Hydropower Station reservoir is 73 million cubic meters, which can be used as a quarterly adjustment. The installed capacity is 60,000 kilowatts, and the power generation was completed in early 1982. Curicia II power station will use the amount of electricity generated by a power station and the nature of the MANDU river, a tributary of the RAPTI river
其他文献
水利电力部于1985年10月25日至30日在郑州主持审查了黄河小浪底工程的轮廓设计。这次设计是经国家计委批准,由黄河水利委员会和美国柏克德土木矿业公司合作组成联合设计组进
一、简介斯特朗蒂亚—斯普林斯混凝土拱坝是美国科罗拉多州丹佛的和奥罗拉西市新供水工程的一个组成部分。坝址基岩一般为优质花岗变质岩,只是在较低河符处坝下和拱坝支座上
洪水和山洪都是由大暴雨、特大暴雨形成的。但由于形成的地点、形成的先后不同,也就有了洪水与山洪的区分。在山区,山高谷深,沟壑纵横,特别是森林植被遭到破坏的地区,往往在
1985年汛期黄河雨洪水沙的基本特点是:伏汛雨水偏枯、秋汛雨水偏丰、水量偏少、沙量偏枯、峰次较少、峰值不高。整个汛期花园口站来水量为265亿米~3,输沙量6.8亿吨,较常年分
中国水利经济研究会受水利部杨振怀部长的委托于今年8月18—19日在京召开了水资源费理论座谈会。参加会议的有国务院技术经济发展研究中心、国家税务局、国家土地管理局、北
水利改革,是建设具有中国特色的社会主义水利事业,实现水利经济良性循环,更好地为“四化”建设服务的必由之路。一年多来,我们江苏的水利改革是在探索中前进的。前几年,水电
笔者在沉降量对时间、测压管水位对库水位等观察资料回归分析计算中发现,具有一定次数的“最小二乘法多项式”作为大坝观察数据的回归方程,其预报精度都优于常采用的几种回归
黄河小浪底坝址大跨度隧洞开挖试验,应用新奥法原理,在对围岩稳定性分析评价的基础上,采用光面爆破和喷锚网配合深孔预应力锚索的支护措施,在多种仪器监测下,顺利地穿越了缓
1980年在四川省石柱县亮厂水库坝基基础混凝土的施工中,试用了高压水流冲毛的方法处理新老混凝土水平施工缝的联接问题,施工方法简便、工期短、投资小、质量较好。现简介如
东北区已建成众多的中小型水库,这些水库是否安全和充分发挥了作用,是众所关心的事情。这篇文章提出了利用各水库本身的水文观测资料进行评价的途径,并以两个水库的实例进行