论文部分内容阅读
石门水电站水轮发电机组系哈尔滨电机厂1974年设计,3号机组哈尔滨电机厂制造:1号,2号机组为天津发电设备厂76年制造。自1975—1979年初先后投产。由于机组从设计、制造、安装等方面存在诸多缺
Shimen Hydropower Station Turbine Generator Unit Harbin Motor Factory 1974 Design, Unit 3 Harbin Electrical Machinery Factory Manufacture: Units 1 and 2 are manufactured in Tianjin Power Plant 76 years. Since 1975-1979 has put into operation. As the crew from the design, manufacture, installation, there are many deficiencies