西钢10m~2竖炉基建及开炉生产策划

来源 :炼铁技术通讯 | 被引量 : 0次 | 上传用户:songyang1988
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
110h竖炉工艺简介西林钢铁集团公司10h竖炉与在建的烧结工序和已投产的焦炉工序一并为新建的高炉工序提供铁料和燃料;同时,竖炉生产的球团矿也为原高炉系统提供所需的球团矿。竖炉主要生产设施有:配料系统设有5个配料槽:烘干系统设有Φ3000×18000e烘干机;造球系统设有Φ5·5m 110h shaft furnace process Brief introduction Xilin Iron and Steel Company 10h shaft furnace and the sintering process under construction and the coke oven process has been put into operation for the new blast furnace process to provide iron and fuel; the same time, the shaft furnace pellet production is also the original Blast furnace system to provide the required pellets. Shaft furnace main production facilities are: batching system with five batching tank: drying system with Φ3000 × 18000e dryer; pelletizing system with Φ5 · 5m