论文部分内容阅读
而单一的地质预报技术无法准确的预报岩溶区的地质状况,从而无法保障岩溶区隧道施工的安全。因此,在对岩溶区进行地质预报时,需要采取综合地质预报技术,以全面预报岩溶区的地质状况。
However, the single geologic forecasting technology can not accurately predict the geological conditions of the karst area and thus can not guarantee the safety of tunnel construction in the karst area. Therefore, in the geological prediction of karst area, the need to take comprehensive geological prediction techniques to fully forecast the geological status of karst area.