论文部分内容阅读
现代的水利工程建设已有了相当的发展,景泰川电力提灌工程提水高度达600m,引大入秦工程的长隧洞开挖达15km。这在艰苦的抗日战争年代简直是不敢想象的。仅举湟惠渠工程在始建阶段遇到的困难,就可见一斑了。汉惠渠工程于民国28年(1939年)3月开工,正值抗日战争时期,经济匾
The construction of modern water conservancy projects has made considerable progress. The water elevation of Jingtechuan Electricity Irrigation Project reaches a height of 600m and the excavation of the long tunnel that leads to the Qinhuangdao Project reaches 15km. This is simply unimaginable in the difficult era of the Anti-Japanese War. To cite only the difficulties encountered during the construction phase of the Hui Wai Canal project is evident. Han Huiqu project in the Republic of China 28 years (1939) started in March, coincided with the War of Resistance Against Japan, economic plaque