一、工程简介及技术要求 枯河节制闸工程位于安徽省泗县境内,是奎濉河近期治理的骨干工程,也是奎濉河上最末一级的控制建筑物,控制流域面积2972km2,该工程兼有防洪、除涝、蓄水的作用。工程等级为Ⅲ等3级,设防烈度8度。枯河节制闸工程为9孔,每孔净宽10m。闸身结构为钢筋混凝土隔孔分缝箱形整体式,闸室及上游铺盖、下游消力池均为C20现浇钢筋混凝土。公路桥面以下部分的现浇钢筋混凝土量为7200m3。
I. Introduction and Technical Requirements of the Project The Wharf Control Barrier Project is located in Si County, Anhui Province. It is the backbone project of the recent Kuih River and also the control building of the last level on the Kui River. The control basin covers an area of 2972km2. Flood control, waterlogging, water storage. Engineering grade Ⅲ grade 3, fortification intensity of 8 degrees. Wharf control sluice project is 9 holes, each hole net width of 10m. Gate structure for the reinforced concrete seams split box integral, lock chamber and upstream bedding, the lower is the C17 cast-in-place reinforced concrete pool. The amount of cast-in-place reinforced concrete below the bridge deck is 7200m3.