论文部分内容阅读
库区淹没洪水标准的确定,直接关系到工程的投资和群众的切身利益。我省的大中型水库淹没处理标准基本上采用建库后5年一遇洪水标准的回水线为土地征用线,20年一遇洪水标准的回水线为房屋人口迁移线。实践结果:
The determination of the flooding flood standard in the reservoir area is directly related to the project investment and the vital interests of the masses. Large and medium-sized reservoir inundation treatment standards in our province basically use the return line of the flood standard once every 5 years since the establishment of the reservoir for the land expropriation line, and the flood return line of the 20-year flood standard is the housing population migration line. Practice results: