随着油田套损井的增加,对套管进行补贴或者封堵的大修井逐年增加,仅2012年大修大队作业20-36联队就进行了7井次的找漏施工,并成功确定其漏点。因此本文根据找漏现场施工情况以及行业标准SY/T5587.4-2004细化及优化后编写而成,可以对兄弟单位的找漏施工起到一定的帮助。
With the increase of casing damage in wells, the overhaul wells that subsidize or block casing have been increasing year by year. In 2012, overhaul brigade operations of 20-36 Wing conducted 7 wells and found leakage point. Therefore, this article is based on the leak site construction and industry standard SY / T5587.4-2004 refinement and optimization of the preparation, you can fraternize the leak construction to play some help.