尼泊尔电力管理局(NEA)正计划对未来两年利用本地劳动力和资源兴建中型蓄水工程的可行性进行确定和评估。目的是确定最近可以实施的工程项目以增加尼泊尔输电网的调峰能力。已委托NEA的水电开发小组进行该项研究。工作计划分3个阶段(每4个月为一阶段):粗略的筛选和排序研
The Nepalese Electricity Authority (NEA) is planning to determine and assess the feasibility of using the local workforce and resources to build medium-sized water storage projects over the next two years. The aim is to identify the most recently implemented projects to increase the peaking capacity of the Nepal transmission network. The Hydro Development Group, which has commissioned NEA, conducted the study. The work plan is divided into 3 phases (one phase every 4 months): rough screening and sequencing