论文部分内容阅读
江西资溪县饶桥镇朱家水电站装机容量110千瓦。自1976年投产至今,8年来连年亏损。1984年该镇加强了小水电建设的管理,对朱家水电站进行了配套改造,当年便创产值13万元,第一次盈利3.5万元。1985年盈利8.7万元,跨入了全国先进行列。朱家水电站的复活,促进了饶桥乡镇建设的发展。1985年乡镇企业产值由1984年的69万元增加到1985年的315万元,一年翻了两番多。镇里建起了电视差转台和电影院,全镇9个村委会都建立了文化室。两年中村民购进电视机280部,山村面貌发生了深刻变化。
Zaqiao Town, Zixi County, Zhu Zhuang hydropower installed capacity of 110 kilowatts. Since it was put into operation in 1976, it has been losing money in recent years. The town in 1984 to strengthen the management of small hydropower construction, Zhuji hydropower station for the transformation, when it hit a production value of 130,000 yuan, the first profit 35,000 yuan. Profit of 87,000 yuan in 1985, entered the ranks of the advanced countries. The revival of Zhuji Hydropower Station has promoted the development of Raoqiao township construction. In 1985, the output value of township and village enterprises increased from 690,000 yuan in 1984 to 3.15 million yuan in 1985, more than tripling for the year. The town built a TV turntable and cinema, the town 9 village committees have established a cultural room. Two years the villagers bought 280 televisions, mountain village has undergone profound changes.