通过对兰州枢纽既有概况及存在问题的分析,结合宝兰客运专线、兰新客运专线等工程的引入,对兰州枢纽客运布局进行了重新调整,经过综合比选推荐两处客运站布局形式,又通过对宝兰客运专线引入客运站的不同,对枢纽客站作业分工及主要客运站的规模进行了论证,最后推荐宝兰客运专线直接引入兰州西站方案。
Through the analysis of existing situation and existing problems in Lanzhou hub, combined with the introduction of Baolan Passenger Dedicated Line and Lanxin Passenger Dedicated Line, the layout of passenger transport in Lanzhou hub was readjusted. After the comprehensive comparison and selection of two terminal layouts, Through the introduction of Baolinshan Passenger Dedicated Passenger Terminal different from the hub station operating division of labor and the size of the main terminal were demonstrated, and finally recommended Baolan Passenger Line Lanzhou West Railway Station directly introduced the program.