论文部分内容阅读
一九九二年一月二十八日在上海铁路分局杨浦站召开了由上海铁路局组织的《自动化管冰机配套在冷藏车加冰系统上的研究》成果鉴定会。审查了鉴定会提供的文件资料、实地参观了系统的运行、加冰过程,并进行了认真讨论, 与会代表认为: 这次成果非常适用于铁路加冰冷藏车的加冰作业,达到了原设计要求。该成果首次建议铁路第一
On January 28, 1992, at the Yangpu station of the Shanghai Railway Sub-bureau, an appraisal meeting was organized for the “Study on Automatic Ice-Cooling Machine Supporting Ice-Freezer Trucks” organized by the Shanghai Railway Bureau. The documents provided by the appraisal meeting were reviewed, the operation of the system was visited on site, and the ice-added process was discussed. Serious discussions were held. Delegates considered that: This result is very suitable for the ice-building operation of railway ice refrigerated trucks and achieved the original design. Claim. This achievement is the first proposed railway first