长庆油田地处黄土高原,地形复杂,山高、坡陡、沟深、弯弯多。油田开发以来,计量站、配水间的建设,曾采用砖瓦现场砌筑的方法施工,不仅条件差、劳动强度大、工效低,而且施工困难;大量的砖、瓦、砂、石、钢材等建筑材料,都得运到施工现场,造成备料时间长,用车多,工期长。特别是沟深、坡陡环境偏辟的地区,困难更大。1978年我们试制了铁
Changqing Oilfield is located in the Loess Plateau, with complex terrain, high mountains, steep slopes, deep ditch, and many bends. Since the development of the oil field, the construction of metering stations and water distribution rooms has been performed using the brick-in-place bricklaying method, which is not only of poor conditions, high labor intensity, low work efficiency, but also difficult construction; a large number of bricks, tiles, sand, stone, steel, etc. Building materials have to be transported to the construction site, resulting in long preparation time, many vehicles and long construction period. Especially in areas with deep trenches and steep slopes, the environment is more difficult. In 1978 we tried the iron