一、背景介绍及选题理由脱硫系统设计依据《内蒙古吉兰泰盐化集团公司40万吨/年聚氯乙烯工程环评影响报告书》及环审【2006】289号文件《关于中盐吉兰泰盐化集团公司40万吨/年聚氯乙烯工程环评影响报告书的批复中排放标准SO_2≤800mg/m3进行设计。2009年底投产运行期按《火电厂大气污染物排放标准》(GB13223-2003)的要求,排放标准执行第3时段标准即:SO_2≤400mg/m3。自2014年7月1日起,火电厂将执行《火电厂大气污染物排放标准》(GB13223-2011),
I. Background and Topic Selection Desulfurization system design is based on “Report on Environmental Impact Assessment of Polymerization of 400,000 T / Y PVC in Jilantai Salt Group, Inner Mongolia” and Circular [2006] No. 289 Document “ Tai Salt Group 400,000 tons / year PVC EIA impact report in the approval of emission standards SO_2 ≤ 800mg / m3 for design. Put into operation at the end of 2009 according to the ”Thermal Power Plant Air Pollutant Emission Standards“ (GB13223-2003) requirements, emission standards for the implementation of the third period of the standard that: SO_2 ≤ 400mg / m3. Since July 1, 2014, the thermal power plant will implement the ”Emission Standard of Air Pollutants for Thermal Power Plants" (GB13223-2011)