论文部分内容阅读
随着城市化进程的不断加速,为高层建筑施工建设创造了条件,桩基础目前是我国高层建筑的主要基础类型,是高层建筑工程建筑施工质量控制的关键。本文主要围绕高层建筑的桩基础施工技术,从施工前的准备工作入手,具体分析沉桩的方法,以及桩基施工。为了适应时代发展的要求,提高高层建筑桩基础施工技术水平,确保工程施工顺利进行。
With the accelerating process of urbanization, it has created the conditions for the construction of high-rise buildings. The pile foundation is the main foundation type of high-rise buildings in our country and the key to the construction quality control of high-rise building engineering. This paper mainly focuses on the pile foundation construction technology of high-rise building, starting with the preparatory work before construction, concretely analyzing the method of pile sinking, and the pile foundation construction. In order to meet the requirements of the development of the times, improve the level of high-rise building pile foundation construction technology to ensure the smooth progress of construction.