抚顺石油一厂蜡加氢反应器1984年6月安装投用,该反应器设计为冷壁反应器,材质为2.25Cr-1Mo,内衬100mm厚的耐热混凝土衬里,在使用过程中,因衬里经常损坏而多次造成装置停车。为了充分发挥2.25Cr-1Mo钢的抗氢、耐热性能,提高容器利用率,合理使用该反应器,于1991年5月请原设计单位重新核算后将其改造为热壁蜡加氢反应器,并请原劳动部锅炉压力容器检测研究中
Fushun a first oil plant wax hydrogenation reactor installed and commissioned in June 1984, the reactor is designed as a cold wall reactor, the material is 2.25Cr-1Mo, lined with 100mm thick heat-resistant concrete lining, in the course of use, due to The lining is often damaged and the unit is parked several times. In order to give full play to 2.25Cr-1Mo steel anti-hydrogen, heat resistance, improve the utilization of the container, the rational use of the reactor, in May 1991 the original design unit to recalculate after the transformation of its hot wall wax hydrogenation reactor , And asked the former Ministry of Labor boiler pressure vessel testing research